Circular or Donut Chart Charts
-
General - Pie and Donut Diagram
The graphic function of DataChain is accessible from the HandleData module
The number of graphs that can be created is not limited.
Pie Chart
Donut
Like other components, DataChain charts can be integrated into Tableaux de Bords.
Creating a Pie Chart and Donut Chart
List of existing graphics
The creation of a graph (like all operations on presentations) is performed from the HandleData module.
- Step 1
-
-
Access HandleData module
-
Choose, in the left menu HandleData, the option Chart associated with the icon
-
Metadata
- 2nd step
-
-
Click on the button
-
A screen allows you to choose the type of graph you want. To create a Circular Diagram or Doughnut type chart, choose the icon
-
Each graph has a metadata panel. Entering a label is required.
-
Optional input areas allow for more description. An icon can thus be assigned to the metadata of a chart.
-
It is advisable to save the metadata as soon as you enter it. Use the button
located in the right part of the top banner of the screen.
Tab - Data Source
- Step 3
-
-
A data source is required to create a Pie type chart. Use the btn-ajouter-source.svg[add a source] icon to access the list of available sources (cf DataBlocks documentation).
-
Proposed sources are related to current user’s rights
It is possible to integrate, on the fly, a file with a separator.
To do this, use the Rapid Integration function via the icon
located in the top banner of the HandleData application.
Sources are powered by DataBlocks.
It is possible, at the level of each source, to carry out operations making it possible to adapt, for a presentation, the blocks of original data by clicking on the icon
Displays a succession of operations such as generation of formulas, filters, aggregations, sorting and modification of labels and types are available.
- Step 4
-
The list of available sources is presented in the form of a table. In the proposed list, choose one (or more) sources then double-click on the line or use the button
to assign the source to the graphic.
Refreshes the list of available sources
Validates source assignment.
It is necessary, before this operation, to choose a source by selecting a line in the table of sources.
Return to the list of sources assigned to the graphic.
Unlike TimeLines or Maps, only one source can be affected
- Step 4 Bis (optional)
-
-
if neededn, the user can make changes to the chosen sources:
-
Added formulas creating new values
-
Generation of filters
-
Sorts
-
Aggregations
-
-
To do this, select one of the sources assigned to the current graph.
-
Use the icon
located at the end of the line (or click on the source label)
-
Make the necessary changes
-
Save changes using the icon
then the
icon to return to the list of sources for the current graph.
-
-
Tab - Settings
General
-
Caption and titles
-
Title: Chart title
-
Font: Font used for the chart title
-
Color: Chart title color
-
Size: Chart title font size
-
-
Subtitle: Chart subtitle
-
Font: Character font used for the graph subtitle
-
Color: Chart subtitle color
-
Size: Chart subtitle font size
-
-
Palette: Color palette associated with the chart
-
Caption: Specifies whether the caption is visible or not
-
Frame: Specifies the presence of a frame around the legend
-
Position: Specifies the position of the legend
-
either inside the graph (inside)
-
either outside the graph (Outside)
-
-
Orientation: Specifies the orientation of the legend
-
is horizontal
-
is vertical
-
-
Vertical alignment: Specifies the location of the legend, top (Top), bottom (Bottom) or centered (Center)
-
Horizontal alignment: Specifies the location of the legend, to the right (Right), to the left (Left) or centered (Center)
-
-
Zoom: Specifies whether the zoom is active or inactive
-
Scroll: Specifies whether the scroll is active or inactive
-
Export: Specifies whether the panel used to export the graph is active or inactive Possible exports are: PNG, JPEG, PDF, SVG and print module
-
Inverted: Rotates the graph by 90°.
-
Tooltip: Allows to define the content of the tooltip. All the columns of the source can be integrated into it.
-
Pie and Donut Chart Settings
-
Type of Chart: allows you to choose the type of Circular or Donut Chart that will be used for the presentation of the chart
Required
-
either
Pie Chart
-
either
Donut
-
Argument: Specifies the column that contains the argument to be taken into account for the chart.
Required
-
Value : Specifies the column that contains the values to be taken into account for the chart.
Required
-
Label: Indicates whether labels are visible or not
-
Connector: Indicates whether the labels are connected to the Circular Diagram or Doughnut by a line
-
Active Click: Indicates whether clicking on an area of the Circular Diagram or the Doughnut causes the display (or disappearance) of the portion concerned.
-
Label overlap: Indicates the label management mode in the event of overlapping. 3 possibilities:
-
Hidden
-
Without
-
Offset
-
-
-
Grouping: The grouping function allows you to group values in a single portion. Two types of grouping are possible
-
TopN: Performs a grouping of the first n values.
-
Lower bound: Performs a grouping of all the values less than or equal to a reference value to be entered.
-
-
Series Allows you to specify other series of values
Editing a DataChain chart
-
Module HandleData.
-
Chart menu
-
At the level of the list of graphics, search for the graphic. it is possible to use the search and sort functions present at the level of each column.
-
Select line
-
Click on the graph label or on the
icon at the end of the line
Deleting a chart
-
HandleData module. Chart menu
-
At the level of the list of graphics, search for the graphic to be deleted. it is possible to use the search and sort functions present at the level of each column.
-
Select line
-
Option 1: Use the button icon
at the end of the line and confirm the action.
-
Option 2:
-
Click on the graphic label or on the
icon at the end of the line.
-
Once in Graphic editing, click on the
button and confirm the action
-
-
Quick Reference
Creation of a Pie Chart and Donut Chart -
From HandleData module
Steps | Objective | Stock | Landmarks |
---|---|---|---|
1 |
Access to the Charts list |
Click on Chart icon |
|
2 |
New Chart |
Click on New icon |
|
3 |
Choose a Pie chart or Doughnet chart type |
Click on the icon |
|
4 |
The metadata |
Enter information |
Description Required |
5 |
Assigning a source |
Click on New source icon |
|
6 |
Chart settings |
Click on the Settings tab |
|
7 |
Visualization of the graph |
Click on the Visualization tab |
|