Chart - Funnel and Pyramid
Funnel and Pyramid
General - Funnel and Pyramid
The graph function of DataChain is accessible from HandleData.
The number of graphs that can be created is not limited.
This function is used to represent data sources in the form of graphs. Several types of graphs are available.
Funnel and Pyramid
Like other components, DataChain charts can be integrated into Tableaux de Bords.
Creating a Tunnel or Pyramid Chart
List of graphics
The creation of a chart (like all operations on charts) is performed from the HandleData module.
- Step 1
-
-
Access HandleData module
-
Choose, in the left menu HandleData, the option Graphic associated with the icon.
-
Metadata
- 2nd step
-
-
Click on the button
-
A screen allows you to choose the type of graph you want. To create a Tunnel or Pyramid chart choose the icon
-
Each chart has a metadata panel. Entering a label is required.
-
Optional input areas allow for more description. An icon can thus be assigned to the graphic.
It is advisable to save the metadata panel as soon as you enter it.
Use the button
located in the right part of the top banner of the graphic screen.
Tab - Data Sources
- Step 3
-
-
A data source is required to create a chart. Use the btn-ajouter-source.svg[add a source] icon to access the list of available sources.cf DataBlocks Documentation.
-
The proposed sources are related to the rights of the current user
It is possible to integrate, on the fly, a file with a separator.
To do this, use the Rapid Integration function via the icon
located in the top banner of the *HandleData* application.
Sources are powered by DataBlocks.
It is possible, at the level of each source, to carry out operations making it possible to adapt, for a presentation, the blocks of original data by clicking on the icon
Displays a succession of operations such as generation of formulas, filters, aggregations, sorting and modification of labels and types are available.
The Dates display format must be defined in the third step to be visible in the Viewer.
- Step 4
-
The list of available sources is presented in the form of a table. In the proposed list, choose one (or more) sources then double-click on the line or use the button
to assign the source to the graphic.
Refreshes the list of available sources
Validates source assignment.
It is necessary, before this operation, to choose a source by selecting a line in the table of sources.
Return to the list of sources assigned to the graphic.
Unlike TimeLines or Maps, only one source can be affected
- Step 4 Bis (optional)
-
-
If needed, user can make changes to ch sourcesgossip:
-
Added formulas creating new values
-
Generation of filters
-
Sorts
-
Aggregations
-
-
In this case, select one of the sources assigned to the current graph. Use the icon
located at the end of the line (or click on source label). Then make the necessary changes. Save the changes using the
button then the
icon to return to the list of sources for the current graph.
-
Tab - Settings
General
Tunnel
-
Caption and titles
-
Title: Chart title.
-
Font: Character font used for the chart title.
-
Color: Chart title color.
-
Size: Chart title font size
-
-
Subtitle: Chart subtitle.
-
Font: Character font used for the graph subtitle.
-
Color: Color of the chart subtitle.
-
Size: Font size of the chart subtitle.
-
-
Palette: Color palette associated with the chart.
-
Caption: Specifies whether the caption is visible or not.
-
Frame: Determines the presence of a frame around the legend.
-
Position: Determines the position of the legend, either
-
inside the chart (inside)
-
outside the chart (Away)
-
-
Orientation: Determines the orientation of the legend, either horizontal or vertical.
-
Vertical alignment: Indicates the location of the legend, top (Top), bottom (Bottom) or centered (Center).
-
Horizontal alignment: Specifies the location of the legend, to the right (Right), to the left (Left) or centered (Center).
-
-
Zoom: Determines whether the zoom is active or inactive.
-
Scroll: Determines if the ability to scroll the graph is active or inactive.
-
Export: Determines whether the panel used to export the graph is active or inactive.
Possible exports are: PNG, JPEG, PDF, SVG and print module -
Inverted: Rotates the graph by 90°. The ordinate becomes a horizontal axis and the abscissa becomes a vertical axis.
-
Tooltip: Allows to define the content of the chart tooltip. All the columns of the source can be integrated into it.
-
Tunnel and Pyramid Setup
-
Inverted: Allows you to invert the direction of the graph.
-
Separation edge: Includes a separation bar between each element of the Tunnel or the Pyramid.
-
Argument: Indicates the column that contains the argument to be taken into account for the graph.
Required
-
Value: Specifies the column that contains the values to be taken into account for the chart.
Required
-
Sort: Performs a sort of values. This sorting has a direct impact on the final graph.
-
Label: Determines whether labels are visible or not.
-
Position: Allows you to determine whether the labels are positioned inside or outside the graph.
-
Alignment: Specifies the horizontal alignment of the labels. Right, Left or Center.
-
-
Mode: Specifies the display mode. Two possible options
-
Tunnel: Tunnel presentation
Tunnel.
-
Pyramid: Presentation in Pyramid
Pyramid.
-
Editing a DataChain chart
-
HandleData module.
Chart Menu
-
At the level of the list of graphics, search for the graphic. It is possible to use the search and sort functions present at the level of each column.
-
Select line
-
Click on the graphic label or on the
icon at the end of the line.
Deleting a chart
Module *HandleData. Chart Menu
-
At the level of the list of graphics, search for the graphic to be deleted. it is possible to use the search and sort functions present at the level of each column.
-
Select line
-
Option 1: Use the button icon
at the end of the line and confirm the action.
-
Option 2:
-
Click on the graphic label or on the
icon at the end of the line.
-
Once in chart editing. Click on the
button and confirm the action.
-
-
Quick Reference
Creation of the Tunnel or Pyramid type graphic Tunnel / Pyramid
From the HandleData module
Steps | Objective | Stock | Landmarks |
---|---|---|---|
1 |
Access to the Charts list |
Click on Chart icon |
|
2 |
New Chart |
Click on New icon |
|
3 |
Choose a chart type |
Click on the icon |
|
4 |
The metadata |
Enter information |
Description Required |
5 |
Assigning a source |
Click on New source icon |
|
6 |
Chart settings |
Click on the Settings tab |
|
7 |
Visualization of the graph |
Click on the Visualization tab |